







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Boxabl Bathroom Remodeling: The Sunrise Manor Owner’s Guide
A full Boxabl bathroom remodel in Sunrise Manor typically runs $9,000 – $28,000 installed, and smaller refreshes land in the $5,000 – $12,000 range. We’re an independent remodeling company, not Boxabl, and we handle the bathroom side of a Casita: shower and tub swaps, vanities, tile, waterproofing, plumbing trim, ventilation, and the repairs that follow a leak. Scheduling starts with a free on-site estimate, and most Sunrise Manor projects get a written price within a few days of that visit.
Owners usually call us after one of three discoveries. The base pan flexes or feels soft underfoot near the drain. Caulk lines around the shower keep reopening no matter how many times they’re redone. Or a vanity cabinet has swelled and separated because a supply line dripped quietly behind it for months. Sunrise Manor sits in a hot, dry climate, but the inside of a Boxabl bathroom stays humid every time someone showers. That trapped moisture is what does the damage, and it rarely announces itself until the floor or the cabinet gives way.
Which Boxabl Models This Applies To

Boxabl’s Casita is a factory-built studio unit, and the bathroom is one of the tightest wet spaces in any modular build. Because Boxabl has shipped different iterations of the Casita over the years, the bathroom footprint, fixture layout, and plumbing rough-in locations have changed between production runs. That matters when you’re matching a replacement pan, valve, or vanity to your specific unit: a part that fits one build year won’t necessarily fit another.
Before we quote anything, we confirm which iteration you have. The serial and build label is usually inside a utility or closet panel, and the model information is stamped on the data plate near the entry. From there we take actual measurements of the shower opening, drain position, valve centerline, and vanity width. Those numbers, not the marketing photos, decide what fits.
OEM part or aftermarket equivalent?
For structural or plumbing-critical pieces, we lean toward the OEM-spec part or a verified equivalent that matches the factory dimensions exactly. For trim, tile, and finish surfaces, a quality aftermarket product often performs better and costs less, because Boxabl’s factory finishes are chosen for weight and shipping durability rather than long-term wear. We’ll tell you which category each item falls into, plainly, before you commit. If you’ve already looked at finishes from KraftMaid, Cambria, or Silestone, we can often work those into a Casita bathroom where the dimensions allow.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Boxabl Bathroom Remodeling Is Failing
Here’s what actually fails in a factory-built bathroom, and why.
- A soft or springy shower floor. The pan or its substrate has flexed one too many times, often from a slow drain leak that soaked the subfloor underneath. If the floor moves when you step near the drain, stop using the shower and get it looked at.
- Caulk that keeps reopening. Recurring gaps at the shower perimeter usually mean movement under the tile or a failed waterproofing layer, not bad caulk. New caulk over a wet substrate just hides the problem.
- A vanity cabinet that swells or smells musty. Particleboard and MDF swell permanently once wet. A slow supply-line drip or a splash zone with no backer is usually the cause, and the cabinet rarely recovers.
- Water stains on the ceiling below or on adjacent walls. In a compact unit, a shower leak often shows up somewhere unexpected. Any stain near the bathroom ceiling or an adjoining wall is worth a professional inspection the same week you spot it.
- Weak or noisy ventilation. A bathroom fan that no longer moves air lets humidity sit against walls and fixtures. In Sunrise Manor’s dry outdoor air, owners often assume humidity isn’t an issue, but a sealed bathroom traps moisture regardless of what it’s like outside.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Bathroom remodeling in Sunrise Manor runs $9,000 – $28,000 for a full remodel and $5,000 – $12,000 for a smaller bathroom. A targeted shower replacement sits at $3,000 – $8,500, a tub-to-shower conversion at $3,500 – $10,000, and a vanity install at $800 – $3,000. What pushes a project toward the top of the range is usually the hidden work: replacing a rotted subfloor, re-doing waterproofing, or re-routing plumbing that was never quite right from the factory. We put the price in writing before any work starts, itemized line by line, so you can see parts, labor, and materials separately. Every job carries our 365-Day Done Right Promise: if something we installed isn’t right within a year of completion, we make it right at no cost to you.
| Scope | Installed price range (Sunrise Manor) |
|---|---|
| Small bathroom remodel | $5,000 – $12,000 |
| Full bathroom remodel | $9,000 – $28,000 |
| Shower replacement | $3,000 – $8,500 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Vanity installation | $800 – $3,000 |
DIY or Call Us?
You can safely check a few things yourself. Look under the vanity for drips, press gently on the shower floor to see if it flexes, and run the fan with a tissue held near the grille to confirm it’s pulling air. Those checks tell us a lot before we arrive.
What you shouldn’t do is open the shower pan or the wall chasing a leak, or try to reset a shower valve that’s tied into the unit’s water supply. A wrong move on a pressurized line in a compact build can flood a small space fast, and modular plumbing doesn’t give you the slack a stick-built wall does. Waterproofing is the other trap: a shower redone without a proper membrane behind the tile will fail again within a season or two. If you’re seeing movement, staining, or recurring moisture, call us at (855) 606-6122 for a free estimate rather than guessing at it.
FAQs

A factory bathroom finish typically holds up for 8 to 15 years before the shower, caulk lines, or vanity start showing wear, and a slow leak can shorten that considerably. In Sunrise Manor, hard water and heavy daily shower use tend to speed up the timeline on caulk and fixtures. Call (855) 606-6122 for an exact assessment.
Sometimes yes. A failed valve, a cracked caulk line, or a finicky fan can often be fixed without a full remodel, and we’ll tell you honestly if repair is the smarter spend. Structural issues like a soft shower pan or water-damaged subfloor usually call for replacement. Call (855) 606-6122 for a free estimate and a straight answer on repair versus replace.
A targeted replacement like a shower pan or vanity typically takes 1 to 3 days, while a full bathroom remodel in a Casita usually runs 1 to 3 weeks, depending on what we find once the walls are open. Hidden damage is the main variable. Call (855) 606-6122 to schedule your free estimate and get a realistic timeline.
We identify the exact model iteration and measurements first, then source the OEM-spec part or a verified equivalent from a supplier that matches the factory dimensions. We don’t claim any Boxabl affiliation, and we don’t keep parts in stock, so we order to your unit’s measurements. Call (855) 606-6122 and we’ll walk you through what your Casita needs.
Whether you’re dealing with a soft shower floor or planning a full bathroom update, the first step is a free, no-pressure estimate. Call (855) 606-6122 to schedule yours with Mason Remodeling Sunrise Manor. You’ll get a written price before any work begins, a crew verified through The Threshold Standard, and the 365-Day Done Right Promise behind every job.
Written by the team at Mason Remodeling Sunrise Manor, serving Sunrise Manor and nearby areas.












