A Mason company - serving Sunrise Manor, NV
A new rear addition with a vaulted beamed ceiling and tall windows
CGI · Sunrise Manor

CGI Home Additions & ADU in Sunrise Manor, NV

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Sunrise Manor
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A remodeled living room with built-in shelves around the fireplace
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

CGI Home Additions & ADU: The Sunrise Manor Owner’s Guide

We build CGI-compatible home additions and ADUs for Sunrise Manor homeowners, and the installed cost runs $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached or attached ADU. This is planned construction, not an emergency call, so we schedule a site visit, measure the lot, and hand you a written line-item price before any work starts. Most owners arrive here after a different discovery: a failed framing inspection, a slab that cracked through the first summer, or a contractor who walked when the scope outgrew the verbal estimate.

Call (855) 606-6122

CGI is a construction and renovation brand name that shows up on plans, modular components and prefabricated panels in this market, and the parts-matching problem is real. If you’re trying to figure out whether a specific CGI-labeled panel, module or fixture set is the right one for your lot and your permit, you’re in the right place. We’re an independent service provider, not affiliated with CGI, and we’ll tell you plainly which parts are CGI-specific and which are standard.

Key Takeaways

  • Addition: $45,000 – $130,000. ADU: $90,000 – $220,000. Garage conversion: $30,000 – $80,000.
  • Every project gets a written price before any work begins, and a written guarantee for 365 days from completion.
  • Clark County permits and inspections are part of the scope, not an add-on.
  • Site visits are technical, not sales. Call (855) 606-6122 to get on the schedule.

Which CGI Models This Applies To

A wide opening with a new beam where the kitchen wall was removed

Compatibility on a CGI-labeled addition or ADU comes down to three identifiers: the plan set number, the panel or module tag, and the structural fastener schedule. The plan set number is usually stamped on the first sheet of the permit drawings. The module tag is a metal or foil label on the frame of each prefabricated section, and it lists the series, the load rating and the date of manufacture. Pull both before you call anyone, because a supplier cannot match a part to “the CGI one” without them.

Here’s the compatibility snag that bites people in Sunrise Manor: CGI plan sets sold for other U.S. climates often specify a roof snow-load and a wall assembly that don’t meet Clark County’s wind and heat requirements. A panel that’s structurally correct on paper can still fail inspection here because it wasn’t spec’d for our wind exposure or our summer heat cycling. Assemblies need to be re-checked against local code, not just matched to the CGI catalog number.

On the OEM-versus-aftermarket question: for structural connectors, hangers and fasteners, use the specified manufacturer’s part. This is a load-path item, and substituting a look-alike is where inspections fail. For finishes, cabinets and surfaces, quality equivalents are fine and often better. We work with KraftMaid, Cambria and Silestone on the finish side, and we’ll tell you when a non-CGI equivalent makes sense and when it absolutely does not.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your CGI Home Additions & ADU Is Failing

Most failures we see on completed CGI-labeled work in Sunrise Manor come from installation and detailing, not from the parts themselves. Here’s what to watch for:

  • Hairline cracks at the slab or stem wall. Usually a sign the slab wasn’t poured on properly compacted, moisture-conditioned base. Our caliche-heavy soil and 100°F-plus summers open those cracks fast.
  • Stucco cracking at panel seams. This is a movement problem, not a paint problem. The seam detail likely didn’t account for thermal expansion between prefabricated modules.
  • Doors and windows that stick in July and free in December. Frame movement from heat cycling. It means the header or flashing wasn’t detailed for our temperature swing.
  • Roof stains or attic moisture after a monsoon. A flashing or underlayment defect at the panel joint. This is the one that turns into drywall damage if it’s left alone.
  • Inspection corrections on the permit file. A pattern of the same failure across multiple visits usually points to a plan set that wasn’t adapted for Clark County requirements.

If you see two or more of these, get someone out to look at it before it becomes structural. Catching a seam or flashing failure early costs a fraction of catching it a year later.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Footing forms with tied rebar for a home addition

Installed prices in Sunrise Manor break down by project type, and these are real figures so you can self-qualify before you call:

Project Installed Range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

What drives the range: square footage, foundation type, roof tie-in complexity, utility runs (water, sewer, electrical, gas), and how much of the existing CGI assembly can be reused versus rebuilt. An ADU with its own meter and a full kitchen sits at the top of the ADU range. A garage conversion with existing slab and walls sits near the bottom of its range. Every quote is line-item and written before any work begins, so you see exactly what the parts, labor and permits cost. Every completed project carries a written guarantee, stated plainly, covering 365 days from the completion date, with a free return visit if a repair or installation fails.

DIY or Call Us?

Some things you can check safely and some you can’t. Safe to do yourself: photograph the module tag or plan set number, measure the wall and roof dimensions, and note where the cracks or stains appear. That’s information we need and it speeds up the estimate.

Not safe to do yourself: structural connections, foundation correction, roof work above a low-pitch plane, and any utility tie-in. This is load-bearing construction. Getting it wrong doesn’t just fail inspection, it can cause injury or a collapse. If panels are modified, the assembly is compromised, and an inspector will call it. That’s why this scope belongs with a licensed crew that pulls the permits and passes the inspections.

A technical site visit is the next step, and it’s free. Call (855) 606-6122 to schedule one.

FAQs

A room opened to the studs with new wiring and plumbing

How long should a CGI addition or ADU last in Sunrise Manor?
A properly built one will last decades. The realistic lifespan for the CGi assembly itself depends on install quality. In our climate, sun exposure and soil movement are the two things that shorten the life of any addition. A well-detailed roof and correctly compacted foundation are what get you there.

Can my failing addition be repaired instead of replaced?
Often, yes. Seam cracks, flashing failures and stucco movement can frequently be corrected without rebuilding the whole structure. The honest answer requires eyes on it: if the foundation and load path are sound, repair is possible and cheaper. Call (855) 606-6122 and we’ll tell you straight, with a written price either way.

How long does a replacement or build take?
An addition typically takes a few months from permit to finish. An ADU takes longer because of utility and inspection steps. We give you a realistic schedule in writing before work starts, and we don’t promise same-day anything on planned construction. Call (855) 606-6122 for a projected timeline specific to your lot.

How do you source the right CGI-compatible parts?
We match from the plan set number and module tag, verify against Clark County code, and source from the specified manufacturer for any structural item. For finishes, we use our professional partnerships with KraftMaid, Cambria and Silestone. We don’t stock parts and we don’t carry them on a truck. What we do is order verified parts for your project and deliver the written price before any work starts.

Every crew member who reaches your door is background-checked, identity-verified and introduced to you by name and photo before the visit under The Threshold Standard, with a photo ID badge shown at arrival. Call (855) 606-6122 for a free estimate.

Written by the team at Mason Remodeling Sunrise Manor, serving Sunrise Manor and nearby areas.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A small remodeled galley kitchen with cabinets to the ceilingA low-threshold walk-in shower with a bench and grab barA finished basement family room with a media wall and wet barA walk-in pantry with wood shelvingA powder room with botanical wallpaper and a stone sinkAn open living space after a whole-home remodel

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Mason in Sunrise Manor

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Sunrise Manor team

A local vetted partner works across Sunrise Manor and the towns around it, to the same written standard as every Mason job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (855) 606-6122
Local Service Coverage

Request a Free Estimate in Sunrise Manor

Tell us what you need - Mason Remodeling Sunrise Manor responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch